Proposals for the Buffalo Sewer Authority’s “SIDNEY-LARK AND EDISON-MARTHA OFFLINE STORAGE TANKS” will be received by the Buffalo Sewer Authority at its Main Office at Room 1038 City Hall, 65 Niagara Square, Buffalo, NY until 10:00 AM local time on Tuesday, March 4th, 2025.

Any questions must be received by Rosaleen B. Nogle, PE, BCEE, BC WRE Principal Sanitary Engineer, by Tuesday, February 18, 2025 by 3:00 PM at rnogle@buffalosewer.org.

BSA RFP SIDNEY-LARK AND EDISON-MARTHA OFFLINE STORAGE TANKS

Appendix A – CSO Storage Tank Flushing Memo

Appendix B – PMT BIM Plan

Appendix C – Sidney OLS Prelim Eng Report

Appendix D – Sidney OLS Environmental Screening Memo

Appendix E – Sidney OLS Subsurface Investigation and Geotech Eval

Appendix F – Sidney OLS Design Table of Contents and Guide Specifications

Appendix G – Sidney OLS Prelim Design Drawings

Appendix H – Sidney OLS 30% Design Considerations and Assumptions

Appendix I – Edison OLS Prelim Eng Report

Appendix J – Edison OLS Environmental Screening Memo

Appendix K – Edison OLS Subsurface Investigation and Geotech Eval

Appendix L – Edison OLS Design Table of Contents and Guide Specifications

Appendix M – Edison OLS Prelim Design Drawings

Appendix N – Edison OLS Design Considerations and Assumptions

Appendix O – Design Requirements for BSA RFPs-2024-10-16

Appendix P – Staffing Worksheet

Appendix Q – BSA EEO Staffing Demographics Form

Appendix R – Cost Proposal

Appendix S – DBE Utilization Plan

Appendix T – MWBE Utilization Plan